Inspection of detailed designs for platforms including buried cable design and planning of drainage
Jan 31, 2020
Inspection of detailed designs for platforms including buried cable design and planning of drainage
Feb 07, 2020
Evaluation of track alignment for various sections on the basis of surveying points, including layout plan and cross sections
Feb 07, 2020
Evaluation of preliminary design for civil engineering of cabling works for provisional and final construction phases including cable management
Feb 06, 2020
Evaluation of track alignment on the basis of surveying points, including layout plan and cross sections
Feb 05, 2020
Cable management for provisional and final construction phases